ASMPT

ASMPT

WORKS Logistics continuously calculates the material demand on the line during freely definable time slices and ensures resupplies in cooperation with the Factory Material Manager software.

Image source: ASMPT

The Material Demand Calculation function automatically calculates the material requirements and thus realizes a just-in-time supply for the production line.

Image source: ASMPT

The Re-use function organizes and optimizes the interim storage of materials in an Active Feeder Rack located in the setup preparation area.

Image source: ASMPT

With AMRs seamlessly integrated into the existing software and hardware landscape, the delivery of substrates to the lines is executed reliably and without operator intervention.

Image source: ASMPT